Power Projects
MAXIM completed construction of our 300 MW Milner 2 (“M2”) Combined Cycle Gas Turbine (“CCGT”) in Q4 2023. The CCGT expansion of M2 has increased the maximum generation capacity of the HR Milner (“Milner”) site to 300 MW and has been designed to lower operations and maintenance costs per MWh. The CCGT expansion of M2 captures waste heat that would otherwise exhaust into the atmosphere and converts it into useful low carbon dispatchable electricity for the Alberta power grid.
In total, MAXIM has 600 MW of natural gas and wind development projects at various stages.
PRAIRIE LIGHTS Grande Prairie, Alberta |
BUFFALO ATLEE WIND Jenner, Alberta |
|
Gas-Fired Generation Project | Crown Lands | |
COD | TBA(1) | TBA(1) |
Capacity (MW) | 400 | 200 |
Fuel Type | Gas | Wind |
Development | Major Permits Obtained | Resource assessment |
(1) Timing to be announced upon advancement of commercial terms.